Site
Search results
-
Restored Wetlands (NRCS 657)
https://agbmps.osu.edu/bmp/restored-wetlands-nrcs-657
removed from agricultural production. Cost analyses should take into account the cost of the wetland as ... https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns Consult your SWCD, NRCS or a wetland contractor as proper siting, vegetation, and construction are ... critical. General design criteria are established for all purposes that establish minimum embankment ...
-
Critical Area Planting (NRCS 342)
https://agbmps.osu.edu/bmp/critical-area-planting-nrcs-342
https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns Critical Area Planting (NRCS 342) ...
-
Open Channel/Two-Stage Ditch (NRCS 582)
https://agbmps.osu.edu/bmp/open-channeltwo-stage-ditch-nrcs-582
field tiles falls on to a vegetated bench rather than into the ditch’s main flow of water. Vegetation is ... https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns Extensive design details are provided in NRCS Standard 582: Open Channel ...
-
Nutrient Management Plan (NRCS 590)
https://agbmps.osu.edu/bmp/nutrient-management-plan-nrcs-590
loss through tile or surface water with water movement. Generally, fields with STP below 50 PPM can ... be divided into areas that represent crop production potential. Common factors used are soil type, ... entered into computer programs to calculate nutrient needs. To meet nutrient needs, programs can balance ...
-
Subsurface Drainage (NRCS 606)
https://agbmps.osu.edu/bmp/subsurface-drainage-nrcs-606
a threshold called field capacity. Some of that amount can drain, through large pores, into a subsurface drain ... https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns Design Drains are typically designed to lower the water table at least 0.5 ft within 24 hours. ...
-
Blind Inlet (NRCS 620)
https://agbmps.osu.edu/bmp/blind-inlet-nrcs-620
https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns Extensive design details are provided in Ohio NRCS Standard 620: Underground Outlet ...
-
Stream Bank Stabilization (NRCS 580)
https://agbmps.osu.edu/bmp/stream-bank-stabilization-nrcs-580
https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns Extensive design details are available at Ohio NRCS Standard 580: Streambank and Shoreline ...
-
Channel Bed Stabilization (NRCS 584)
https://agbmps.osu.edu/bmp/channel-bed-stabilization-nrcs-584
https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns Extensive design details are provided in NRCS Standard 584: Channel Bed Stabilization ...
-
CFAES and General Assignment Space Reservation Request Form
CFAES and General Assignment Space Reservation Requests CFAES and General Assingment spaces are ... reserve a CFAES or General Assignment space for a meeting or an event. 1) Determine which space you want. ... A list of spaces is on our web page Columbus Mid-West CFAES Instructional, Meeting, and General ...
-
Resource Cafe
including general library services, information literacy, copyright services, and more. Table #8 Student ... 2023-24 includes New Quizzes in CarmenCanvas and the General Education program’s use of PebblePad. Table ... into real-world, market-ready manufactured products. Signature capabilities include additive ...