Site

Search results

  1. Controlled Drainage/Drainage Water Management (NRCS 554)

    https://agbmps.osu.edu/bmp/controlled-drainagedrainage-water-management-nrcs-554

    systematic drainage, consisting of a main drain and laterals that empty into the main. These structures can ... outlet is elevated during the nongrowing season by inserting stoplogs into the control structure after ... https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns Extensive design details are provided in NRCS Conservation Practice Standard 554. ...

  2. Water and Sediment Basin (NRCS 350 & 638)

    https://agbmps.osu.edu/bmp/water-and-sediment-basin-nrcs-350-638

    generally constructed across a slope to develop minor water courses that trap sediment and/or detain water. ... topography is generally irregular. Watercourse and gully erosion are a problem. Sheet and rill erosion levels ... requirements. If used with terraces, water and sediment control basins should generally be spaced at terrace ...

  3. Saturated Buffer (NRCS 604)

    https://agbmps.osu.edu/bmp/saturated-buffer-nrcs-604

    Isenhart, 2014). An Iowa study saw 35–59 percent tile flow diverted into buffers throughout the first four ... the water. Sediments and associated  phosphorus flow into the soil profile where they can be trapped. ... https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns Extensive design details are provided in Ohio NRCS Standard 604: Saturated Buffers   ...

  4. Vegetated Treatment Area (NRCS 635)

    https://agbmps.osu.edu/bmp/vegetated-treatment-area-nrcs-635

    https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns Vegetated Treatment Area (NRCS 635) ...

  5. Restored Wetlands (NRCS 657)

    https://agbmps.osu.edu/bmp/restored-wetlands-nrcs-657

    removed from agricultural production. Cost analyses should take into account the cost of the wetland as ... https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns Consult your SWCD, NRCS or a wetland contractor as proper siting, vegetation, and construction are ... critical. General design criteria are established for all purposes that establish minimum embankment ...

  6. Riparian Forest Buffers (NRCS 391)

    https://agbmps.osu.edu/bmp/riparian-forest-buffers-nrcs-391

    Its purpose is to prevent sediments and pollutants from directly discharging into aquatic ecosystems. ... revegetated or rebuilt (e.g., by way of stream bank reengineering), costs can increase quickly. In general ... https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns NRCS Standard 391: Riparian Forest Buffer ...

  7. Schedule an Appointment

    https://students.cfaes.ohio-state.edu/advisingappointments

    Plan/Projection Creation General Education Requirements Graduation Concerns Major Change/Addition Probation or ...

  8. Critical Area Planting (NRCS 342)

    https://agbmps.osu.edu/bmp/critical-area-planting-nrcs-342

    https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns Critical Area Planting (NRCS 342) ...

  9. Tillage Intensity to Maintain Target Residue Cover (NRCS 329, 345 & 346)

    https://agbmps.osu.edu/bmp/tillage-intensity-maintain-target-residue-cover-nrcs-329-345-346

    Based on how much crop residue is left on the soil surface, tillage practices generally fall into three ... a targeted amount of crop residue on the soil surface. The target is generally an after-planting residue ... accomplished using disc openers, coulter(s), row cleaners, in-row chisels, or roto-tillers planted into the ...

  10. Crop Rotation (NRCS 328)

    https://agbmps.osu.edu/bmp/crop-rotation-nrcs-328

    https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns Conservation Crop Rotation NRCS 328 ...

Pages