Site

Did you mean
general into

Search results

  1. Vegetative Barrier (NRCS 601)

    https://agbmps.osu.edu/bmp/vegetative-barrier-nrcs-601

    Permanent strips of stiff, dense vegetation established along the general contour of slopes or ... https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns Vegetative Barrier (NRCS 601) ...

  2. Change Style Preference: Strengthening Your Capacity to Lead Self & Others

    https://leadershipcenter.osu.edu/events/change-style-preference-strengthening-your-capacity-lead-self-others

    614-292-3114. Requests made 10 days prior to the event will generally allow us to provide seamless access, but ...

  3. Vegetated Treatment Area (NRCS 635)

    https://agbmps.osu.edu/bmp/vegetated-treatment-area-nrcs-635

    https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns Vegetated Treatment Area (NRCS 635) ...

  4. Critical Area Planting (NRCS 342)

    https://agbmps.osu.edu/bmp/critical-area-planting-nrcs-342

    https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns Critical Area Planting (NRCS 342) ...

  5. Grassed Waterways (NRCS 412)

    https://agbmps.osu.edu/bmp/grassed-waterways-nrcs-412

    benefits are very site-specific, so generalized improvements of water quality benefits are difficult to ... local SWCD or NRCS for available programs. Maintenance costs primarily involve mowing and generally do ... https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns Extensive design details are provided in  Ohio NRCS Standard 412: Grassed Waterway ...

  6. Water and Sediment Basin (NRCS 350 & 638)

    https://agbmps.osu.edu/bmp/water-and-sediment-basin-nrcs-350-638

    generally constructed across a slope to develop minor water courses that trap sediment and/or detain water. ... topography is generally irregular. Watercourse and gully erosion are a problem. Sheet and rill erosion levels ... requirements. If used with terraces, water and sediment control basins should generally be spaced at terrace ...

  7. Constructed Wetlands (NRCS 656)

    https://agbmps.osu.edu/bmp/constructed-wetlands-nrcs-656

    Generally considered cost efficient with a cost per unit of nutrient reduction range from $1.60 to $5.00/Kg ... https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns Consult your SWCD, NRCS or a drainage contractor as proper sizing and construction are critical. ... General design criteria are established for all purposes that establish minimum embankment height, ...

  8. Amending Soils with Lime or Gypsum (NRCS 333)

    https://agbmps.osu.edu/bmp/amending-soils-lime-or-gypsum-nrcs-333

    magnesium (5%) carbonates. A variety of materials have neutralizing capabilities but are generally less ... a single application in a single year. Cost Generally both lime and gypsum are sourced from set locations ... Liming. Generally, lime costs are $15 to $30 per delivered ton but since quality of material can vary, the ...

  9. Hamilton County 4-H Clubs

    https://hamilton.osu.edu/program-areas/4-h-youth-development/join-hamilton-county-4-h/hamilton-county-4-h-clubs

    (Finneytown) The Dreaweaver's 4-H club focuses on a range of general projects like STEM, cooking, sewing, ... Cloverbuds and 4-H  members.  Our members enjoy participating in general projects like cooking, photography, art, ... cooking, and more through a variety of general projects.  During our club meetings, we love teaching each ...

  10. Dr. Leo Taylor, PhD

    https://cfaesdei.osu.edu/people/dr-leo-taylor

    time Leo enjoys dancing, thrifting, making mosaic art, nature, performing, and generally challenging ...

Pages