Site
- Did you mean
- general into
Search results
-
Partners gather for Trimble Technologies Lab ribbon cutting
https://fabe.osu.edu/news/partners-gather-trimble-technologies-lab-ribbon-cutting
the university at large. Jim Chambers, Senior Vice President and General Manager of Trimble ...
-
Graduate students win ASABE Presentation Excellence Awards
https://fabe.osu.edu/news/graduate-students-win-asabe-presentation-excellence-awards
"It takes a lot of preparation to explain our research to general audiences in a short presentation, ...
-
Vegetated Treatment Area (NRCS 635)
https://agbmps.osu.edu/bmp/vegetated-treatment-area-nrcs-635
https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns Vegetated Treatment Area (NRCS 635) ...
-
Critical Area Planting (NRCS 342)
https://agbmps.osu.edu/bmp/critical-area-planting-nrcs-342
https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns Critical Area Planting (NRCS 342) ...
-
Grassed Waterways (NRCS 412)
https://agbmps.osu.edu/bmp/grassed-waterways-nrcs-412
benefits are very site-specific, so generalized improvements of water quality benefits are difficult to ... local SWCD or NRCS for available programs. Maintenance costs primarily involve mowing and generally do ... https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns Extensive design details are provided in Ohio NRCS Standard 412: Grassed Waterway ...
-
Turfgrass
https://ppdc.osu.edu/submit-sample/turfgrass
2710 North Star, Columbus, Ohio 43221 Turfgrass and Lawns Sample Fees: Ohio General ...
-
Water and Sediment Basin (NRCS 350 & 638)
https://agbmps.osu.edu/bmp/water-and-sediment-basin-nrcs-350-638
generally constructed across a slope to develop minor water courses that trap sediment and/or detain water. ... topography is generally irregular. Watercourse and gully erosion are a problem. Sheet and rill erosion levels ... requirements. If used with terraces, water and sediment control basins should generally be spaced at terrace ...
-
Constructed Wetlands (NRCS 656)
https://agbmps.osu.edu/bmp/constructed-wetlands-nrcs-656
Generally considered cost efficient with a cost per unit of nutrient reduction range from $1.60 to $5.00/Kg ... https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns Consult your SWCD, NRCS or a drainage contractor as proper sizing and construction are critical. ... General design criteria are established for all purposes that establish minimum embankment height, ...
-
Amending Soils with Lime or Gypsum (NRCS 333)
https://agbmps.osu.edu/bmp/amending-soils-lime-or-gypsum-nrcs-333
magnesium (5%) carbonates. A variety of materials have neutralizing capabilities but are generally less ... a single application in a single year. Cost Generally both lime and gypsum are sourced from set locations ... Liming. Generally, lime costs are $15 to $30 per delivered ton but since quality of material can vary, the ...
-
Vita Data Entry Update – Dec. 15 Deadline for 2023
As previously announced, Vita was retired for general Ohio State use on Aug. 1. However, all OSU ...