Site

Did you mean
general into

Search results

  1. Partners gather for Trimble Technologies Lab ribbon cutting

    https://fabe.osu.edu/news/partners-gather-trimble-technologies-lab-ribbon-cutting

    the university at large.  Jim Chambers, Senior Vice President and General Manager of Trimble ...

  2. Graduate students win ASABE Presentation Excellence Awards

    https://fabe.osu.edu/news/graduate-students-win-asabe-presentation-excellence-awards

    "It takes a lot of preparation to explain our research to general audiences in a short presentation, ...

  3. Vegetated Treatment Area (NRCS 635)

    https://agbmps.osu.edu/bmp/vegetated-treatment-area-nrcs-635

    https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns Vegetated Treatment Area (NRCS 635) ...

  4. Critical Area Planting (NRCS 342)

    https://agbmps.osu.edu/bmp/critical-area-planting-nrcs-342

    https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns Critical Area Planting (NRCS 342) ...

  5. Grassed Waterways (NRCS 412)

    https://agbmps.osu.edu/bmp/grassed-waterways-nrcs-412

    benefits are very site-specific, so generalized improvements of water quality benefits are difficult to ... local SWCD or NRCS for available programs. Maintenance costs primarily involve mowing and generally do ... https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns Extensive design details are provided in  Ohio NRCS Standard 412: Grassed Waterway ...

  6. Turfgrass

    https://ppdc.osu.edu/submit-sample/turfgrass

    2710 North Star, Columbus, Ohio 43221   Turfgrass and Lawns Sample Fees: Ohio General ...

  7. Water and Sediment Basin (NRCS 350 & 638)

    https://agbmps.osu.edu/bmp/water-and-sediment-basin-nrcs-350-638

    generally constructed across a slope to develop minor water courses that trap sediment and/or detain water. ... topography is generally irregular. Watercourse and gully erosion are a problem. Sheet and rill erosion levels ... requirements. If used with terraces, water and sediment control basins should generally be spaced at terrace ...

  8. Constructed Wetlands (NRCS 656)

    https://agbmps.osu.edu/bmp/constructed-wetlands-nrcs-656

    Generally considered cost efficient with a cost per unit of nutrient reduction range from $1.60 to $5.00/Kg ... https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns Consult your SWCD, NRCS or a drainage contractor as proper sizing and construction are critical. ... General design criteria are established for all purposes that establish minimum embankment height, ...

  9. Amending Soils with Lime or Gypsum (NRCS 333)

    https://agbmps.osu.edu/bmp/amending-soils-lime-or-gypsum-nrcs-333

    magnesium (5%) carbonates. A variety of materials have neutralizing capabilities but are generally less ... a single application in a single year. Cost Generally both lime and gypsum are sourced from set locations ... Liming. Generally, lime costs are $15 to $30 per delivered ton but since quality of material can vary, the ...

  10. Vita Data Entry Update – Dec. 15 Deadline for 2023

    https://extops.cfaes.ohio-state.edu/newsletter/news-and-notes/september-15-2023/vita-data-entry-update-%E2%80%93-dec-15-deadline-2023

    As previously announced, Vita was retired for general Ohio State use on Aug. 1. However, all OSU ...

Pages