Site

Did you mean
general into

Search results

  1. Subsurface Placement of Nutrient

    https://agbmps.osu.edu/bmp/subsurface-placement-nutrient

    Effectiveness and Considerations Crop Production From a general crop production standpoint, plant-root systems ... availability support uptake. Plants generally have a greater percentage of their root systems located near the ... https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns   Equipment manufacturers and agronomists should be consulted for design information on this ...

  2. Restored Wetlands (NRCS 657)

    https://agbmps.osu.edu/bmp/restored-wetlands-nrcs-657

    https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns Consult your SWCD, NRCS or a wetland contractor as proper siting, vegetation, and construction are ... critical. General design criteria are established for all purposes that establish minimum embankment ...

  3. Riparian Forest Buffers (NRCS 391)

    https://agbmps.osu.edu/bmp/riparian-forest-buffers-nrcs-391

    revegetated or rebuilt (e.g., by way of stream bank reengineering), costs can increase quickly. In general ... https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns NRCS Standard 391: Riparian Forest Buffer ...

  4. Tillage Intensity to Maintain Target Residue Cover (NRCS 329, 345 & 346)

    https://agbmps.osu.edu/bmp/tillage-intensity-maintain-target-residue-cover-nrcs-329-345-346

    a targeted amount of crop residue on the soil surface. The target is generally an after-planting residue ... Based on how much crop residue is left on the soil surface, tillage practices generally fall into three ... throughout the critical wind erosion period. Generally involves plowing or intensive (numerous) tillage ...

  5. Controlled Drainage/Drainage Water Management (NRCS 554)

    https://agbmps.osu.edu/bmp/controlled-drainagedrainage-water-management-nrcs-554

    https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns Extensive design details are provided in NRCS Conservation Practice Standard 554. ...

  6. Wood Chip Bioreactor (NRCS 605)

    https://agbmps.osu.edu/bmp/wood-chip-bioreactor-nrcs-605

    https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns Extensive design considerations can be found  NRCS Standard 605: Denitrifying Bioreactor ...

  7. Water Control Structure (NRCS 587)

    https://agbmps.osu.edu/bmp/water-control-structure-nrcs-587

    https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns Consult your SWCD, NRCS or a drainage contractor as proper sizing and construction are critical. ...

  8. Saturated Buffer (NRCS 604)

    https://agbmps.osu.edu/bmp/saturated-buffer-nrcs-604

    https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns Extensive design details are provided in Ohio NRCS Standard 604: Saturated Buffers   ...

  9. Open Channel/Two-Stage Ditch (NRCS 582)

    https://agbmps.osu.edu/bmp/open-channeltwo-stage-ditch-nrcs-582

    https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns Extensive design details are provided in  NRCS Standard 582: Open Channel ...

  10. Educational Resources

    https://hamilton.osu.edu/program-areas/4-h-youth-development/educational-resources

    General Resources Ohio 4-H Self-Determined Project Starters 4-H Project Central Ohio 4-H STEM Pathways ...

Pages