Site

Did you mean
general into

Search results

  1. Clay Miller

    https://advancement.cfaes.ohio-state.edu/people/clay-miller

    and dual minors in General Business and Substance Abuse Counseling. In November of 2018, he joined the ...

  2. Vegetative Barrier (NRCS 601)

    https://agbmps.osu.edu/bmp/vegetative-barrier-nrcs-601

    Permanent strips of stiff, dense vegetation established along the general contour of slopes or ... https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns Vegetative Barrier (NRCS 601) ...

  3. Vegetated Treatment Area (NRCS 635)

    https://agbmps.osu.edu/bmp/vegetated-treatment-area-nrcs-635

    https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns Vegetated Treatment Area (NRCS 635) ...

  4. Critical Area Planting (NRCS 342)

    https://agbmps.osu.edu/bmp/critical-area-planting-nrcs-342

    https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns Critical Area Planting (NRCS 342) ...

  5. Grassed Waterways (NRCS 412)

    https://agbmps.osu.edu/bmp/grassed-waterways-nrcs-412

    benefits are very site-specific, so generalized improvements of water quality benefits are difficult to ... local SWCD or NRCS for available programs. Maintenance costs primarily involve mowing and generally do ... https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns Extensive design details are provided in  Ohio NRCS Standard 412: Grassed Waterway ...

  6. Water and Sediment Basin (NRCS 350 & 638)

    https://agbmps.osu.edu/bmp/water-and-sediment-basin-nrcs-350-638

    generally constructed across a slope to develop minor water courses that trap sediment and/or detain water. ... topography is generally irregular. Watercourse and gully erosion are a problem. Sheet and rill erosion levels ... requirements. If used with terraces, water and sediment control basins should generally be spaced at terrace ...

  7. Constructed Wetlands (NRCS 656)

    https://agbmps.osu.edu/bmp/constructed-wetlands-nrcs-656

    Generally considered cost efficient with a cost per unit of nutrient reduction range from $1.60 to $5.00/Kg ... https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns Consult your SWCD, NRCS or a drainage contractor as proper sizing and construction are critical. ... General design criteria are established for all purposes that establish minimum embankment height, ...

  8. Amending Soils with Lime or Gypsum (NRCS 333)

    https://agbmps.osu.edu/bmp/amending-soils-lime-or-gypsum-nrcs-333

    magnesium (5%) carbonates. A variety of materials have neutralizing capabilities but are generally less ... a single application in a single year. Cost Generally both lime and gypsum are sourced from set locations ... Liming. Generally, lime costs are $15 to $30 per delivered ton but since quality of material can vary, the ...

  9. Riparian Forest Buffers (NRCS 391)

    https://agbmps.osu.edu/bmp/riparian-forest-buffers-nrcs-391

    revegetated or rebuilt (e.g., by way of stream bank reengineering), costs can increase quickly. In general ... https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns NRCS Standard 391: Riparian Forest Buffer ...

  10. Restored Wetlands (NRCS 657)

    https://agbmps.osu.edu/bmp/restored-wetlands-nrcs-657

    https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns Consult your SWCD, NRCS or a wetland contractor as proper siting, vegetation, and construction are ... critical. General design criteria are established for all purposes that establish minimum embankment ...

Pages