Site

Did you mean
general into

Search results

  1. CFAES Alumni Homecoming Weekend

    https://advancement.cfaes.ohio-state.edu/alumni/homecoming

    available through our link until Aug. 17; after that our block of tickets will be released to the general ... block of tickets will be released to the general public.   Go to this link: Virtual Venue | My Ohio ...

  2. CFAES Homecoming expanded to include opportunities for all

    https://advancement.cfaes.ohio-state.edu/july-2022/cfaes-homecoming-expanded-include-opportunities-all

    general public. For any questions, reach out to Chan White, Event Coordinator at white.1309@osu.edu.   ...

  3. Vegetated Treatment Area (NRCS 635)

    https://agbmps.osu.edu/bmp/vegetated-treatment-area-nrcs-635

    https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns Vegetated Treatment Area (NRCS 635) ...

  4. Critical Area Planting (NRCS 342)

    https://agbmps.osu.edu/bmp/critical-area-planting-nrcs-342

    https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns Critical Area Planting (NRCS 342) ...

  5. Constructed Wetlands (NRCS 656)

    https://agbmps.osu.edu/bmp/constructed-wetlands-nrcs-656

    Generally considered cost efficient with a cost per unit of nutrient reduction range from $1.60 to $5.00/Kg ... https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns Consult your SWCD, NRCS or a drainage contractor as proper sizing and construction are critical. ... General design criteria are established for all purposes that establish minimum embankment height, ...

  6. Amending Soils with Lime or Gypsum (NRCS 333)

    https://agbmps.osu.edu/bmp/amending-soils-lime-or-gypsum-nrcs-333

    magnesium (5%) carbonates. A variety of materials have neutralizing capabilities but are generally less ... a single application in a single year. Cost Generally both lime and gypsum are sourced from set locations ... Liming. Generally, lime costs are $15 to $30 per delivered ton but since quality of material can vary, the ...

  7. Phosphorus Removal Structure (NRCS 782)

    https://agbmps.osu.edu/bmp/phosphorus-removal-structure-nrcs-782

    dependent. Structures can generally be placed in non-production spaces such as buffer areas near the field ... generally 2-3 times the agronomic STP need of many crops grown. Fields with a STP value of 100 mg/kg Mehlich ... Generally, any product with a high affinity for P, suitable physical characteristics, and is safe for use in ...

  8. Vegetative Barrier (NRCS 601)

    https://agbmps.osu.edu/bmp/vegetative-barrier-nrcs-601

    Permanent strips of stiff, dense vegetation established along the general contour of slopes or ... https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns Vegetative Barrier (NRCS 601) ...

  9. Restored Wetlands (NRCS 657)

    https://agbmps.osu.edu/bmp/restored-wetlands-nrcs-657

    https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns Consult your SWCD, NRCS or a wetland contractor as proper siting, vegetation, and construction are ... critical. General design criteria are established for all purposes that establish minimum embankment ...

  10. Riparian Forest Buffers (NRCS 391)

    https://agbmps.osu.edu/bmp/riparian-forest-buffers-nrcs-391

    revegetated or rebuilt (e.g., by way of stream bank reengineering), costs can increase quickly. In general ... https://agbmps.osu.edu/submit/email-general-questions-comments-or-concerns NRCS Standard 391: Riparian Forest Buffer ...

Pages